|
ADMINISTRATIVE
FEE**
|
$10.00
|
|
ONE
AND TWO FAMILY construction, reconstruction
or alteration
Minimum fee
|
$11.00 per
thousand of total cost
$40.00 plus admin fee**
|
|
ALL
OTHER construction,
reconstruction or alteration
Minimum fee
|
$15.00 per
thousand of total cost
$120.00 plus admin fee** |
|
For demolition of a structure
|
$200.00
|
|
Moving of a structure
|
$150.00
|
|
Erect sign, banner,
awning
|
$50.00 base
plus $6.00 per $100.00 of cost |
|
Installation
of a tank for the re-sale or storage, use and distribution of any fluid
other than water
(does not include tanks installed in dwellings for storage of oil for
domestic use)
|
$75.00 |
|
Certificate of Occupancy
|
$100.00
|
|
Temporary
Certificate of Occupancy (monthly)
|
$50.00 |
|
Mobile
Structure
|
$50.00 |
|
Dumpsters
|
$35.00
|
|
Reinspection Fee
(payable in advance)
|
$50.00
|
|
Work
started with out permit |
TRIPLE
FEE OF TOTAL COST |
|
Removal
of illegal work |
$300.00 |